Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
e-Expo-billing@beckyshousekeeping.com
Outside-of-football-lottery-careers@coolantsinformation.com
Miu Miu
广州民航职业技术学院
hg-crown-feedback@daviesscountylandtitle.com
棋牌游戏
Crown-betting-marketing@4seasonstanning.net
网赌平台
jdb-Electronics-feedback@berrycreekcommunitychurch.com
澳门赌场
苏州生活网
拍客网
云南工商学院
乐乐居装修网
营口百姓网
5另类
淮安齐装网
安吉尔净水器
金融工场
看企业网